![Pilatus PC-12/47E MSN-1001-UP Скачать руководство пользователя страница 189](http://html.mh-extra.com/html/pilatus/pc-12-47e-msn-1001-up/pc-12-47e-msn-1001-up_maintenance-manual_1556201189.webp)
Table 2 Master Maintenance Plan Task List (Continued from previous page)
Task number
Item Name
Task Description
Interval
Data Module Refer-
ence
*71-00/17
Engine mounting
frame, replace all
bolts, washers and
nuts
Life limit
11,000 FH
-
71-00/38
Engine shock mount
assemblies
Overhaul
At engine overhaul
but not later than
5000 FH
-
71-00/101
Power plant torque
limiter
Operational test
600 FH / 12 Months
12-B-71-00-00-00A-
903G-A
71-00/102
Power plant perform-
ance
Operational test
600 FH / 12 Months
12-B-71-00-00-00A-
903H-A
71-00/107
Engine torque and
stick pusher torque
transducer electrical
connectors
Clean
600 FH / 12 Months
12-B-71-00-03-00A-
250A-A
71-00/204
Power plant
Post inspection
ground run tests
Job Close Up
12-B-71-00-00-00A-
903A-A
71-00/205
Engine tubular
mounting frame and
shockmounts
Examine. Replace
shockmount if cracks
in elastomer are
more than 25,4 mm
(1 in) long and/or 1,5
mm (0.06 in) deep.
1,200 FH / 12 Months -
71-00/209
Engine drain mast
and tank
Examine the drain
mast for fuel leaks
(no leaks permitted)
and drain the collec-
tor tank.
300 FH / 12 Months
-
71-00/287
Power plant
Do an inspection
ground run as neces-
sary. Record any de-
fects.
Note
A pre-inspection
ground run is not a
prerequisite but may
be useful to deter-
mine any repair work
needed to maintain
the airworthiness of
the aircraft.
Job Set Up
12-B-71-00-00-00A-
903A-A
PC-12/47E AMM Doc No 02300, ISSUE 01 REVISION 26 MSN 545, 1001-1719,
1721-1999
12-B-AM-00-00-00-I
UNCLASSIFIED
Effectivity: All
12-B-05-40-00-00A-000B-A
UNCLASSIFIED
2021-12-04 Page 50