![Pilatus PC-12/47E MSN-1001-UP Скачать руководство пользователя страница 54](http://html.mh-extra.com/html/pilatus/pc-12-47e-msn-1001-up/pc-12-47e-msn-1001-up_maintenance-manual_1556201054.webp)
Document title
Data module code
Issue date
Effectivity
FIVE-BLADED PROPELLER - AD-
JUSTMENT/TEST
C
2021-12-04
FIVE-BLADED
PROPELLER
FOUR-BLADED PROPELLER -
BLADES - REPAIR
12-B-61-00-00-00A-904A-A
2017-07-19
FOUR-BLA-
DED PRO-
PELLER
FIVE-BLADED PROPELLER - BLADES
- REPAIR
12-B-61-00-00-00A-904B-A
2017-07-19
FIVE-BLADED
PROPELLER
FOUR-BLADED PROPELLER ASSEM-
BLY - INSTALL AN ITEM IN A CON-
TAINER
12-B-61-10-01-00A-830A-A
2021-07-08
All
FOUR-BLADED PROPELLER ASSEM-
BLY - REMOVE AN ITEM FROM A
CONTAINER
12-B-61-10-01-00A-840A-A
2021-07-08
All
FOUR-BLADED PROPELLER - RE-
MOVAL/INSTALLATION
12-B-61-10-01-00A-920A-A
2018-05-24
FOUR-BLA-
DED PRO-
PELLER
FIVE-BLADED PROPELLER - INSTALL
AN ITEM IN A CONTAINER
12-B-61-10-01-00A-830B-A
2021-07-08
All
FIVE-BLADED PROPELLER - RE-
MOVE AN ITEM FROM A CONTAINER
12-B-61-10-01-00A-840B-A
2021-07-08
All
FIVE-BLADED PROPELLER - REMOV-
AL/INSTALLATION
12-B-61-10-01-00A-920B-A
2018-05-24
FIVE-BLADED
PROPELLER
GOVERNOR - REMOVAL/INSTALLA-
TION
12-B-61-20-01-00A-920A-A
2017-07-19
ALL
LOW PITCH WARNING SWITCH - RE-
MOVAL/INSTALLATION
12-B-61-20-02-00A-920A-A
2017-07-19
ALL
OVERSPEED GOVERNOR - REMOV-
AL/INSTALLATION
12-B-61-20-03-00A-920A-A
2017-07-19
ALL
POWERPLANT - DESCRIPTION AND
OPERATION
12-B-71-00-00-00A-040A-A
2017-07-19
ALL
POWERPLANT - CLEAN
C
2021-12-04
ALL
POWERPLANT - MAINTENANCE
PRACTICES
12-B-71-00-00-00A-901A-A
2018-02-13
ALL
POWER PLANT - ADJUSTMENT/TEST 12-B-71-00-00-00A-903A-A
2021-07-08
ALL
POWER PLANT TEST 1 – ENGINE OIL
PRESSURE - ADJUSTMENT/TEST
12-B-71-00-00-00A-903B-A
2017-07-19
ALL
POWER PLANT TEST 2 - PROPEL-
LER BLADE FEATHER - ADJUST-
MENT/TEST
12-B-71-00-00-00A-903C-A
2021-07-08
ALL
POWER PLANT TEST 3 – DC GENER-
ATION SYSTEM - ADJUSTMENT/TEST
12-B-71-00-00-00A-903D-A
2018-11-29
ALL
POWER PLANT TEST 4 – MAXI-
MUM PROPELLER SPEED - ADJUST-
MENT/TEST
12-B-71-00-00-00A-903E-A
2017-07-19
ALL
POWER PLANT TEST 5– BLEED
VALVE CLOSING POINT - ADJUST-
MENT/TEST
12-B-71-00-00-00A-903F-A
2017-07-19
ALL
POWER PLANT TEST 6 – TORQUE
LIMITER - ADJUSTMENT/TEST
12-B-71-00-00-00A-903G-A
2017-07-19
ALL
PC-12/47E AMM Doc No 02300, ISSUE 01 REVISION 26 MSN 545, 1001-1719,
1721-1999
12-B-AM-00-00-00-I
UNCLASSIFIED
Effectivity: All
12-B-00-00-00-00A-002A-A
UNCLASSIFIED
2021-12-10 Page 52