UNSCHEDULED MAINTENANCE CHECKS
INTRODUCTION
Table of Contents
Page
UNSCHEDULED MAINTENANCE CHECKS - INTRODUCTION...............................................
1
2
3
3.1
3.2
4
Index of Tables
Page
1
2
3
Index of Figures
Page
1
2
Refinement Chart – Negative Load Factor.............................................................
References
Table 1 References
Data module/Technical publication
Title
12-B-05-50-01-00A-282A-A
HARD LANDING - UNSCHEDULED INSPECTIONS
12-B-05-50-01-00A-282B-A
HARD LANDING – ELECTRO MECHANICAL LANDING
GEAR - UNSCHEDULED INSPECTION
12-B-05-50-02-00A-282A-A
FLIGHT IN SEVERE TURBULENCE OR SEVERE MANEU-
VRES - UNSCHEDULED INSPECTIONS
12-B-05-50-03-00A-282A-A
OVERSPEED WITH FLAPS EXTENDED - UNSCHEDULED
INSPECTIONS
12-B-05-50-04-00A-282A-A
PROPELLER SUDDEN STOPAGE OR IMPACT - UNSCHED-
ULED INSPECTIONS
12-B-05-50-05-00A-282A-A
LIGHTNING STRIKE - UNSCHEDULED INSPECTIONS
12-B-05-50-06-00A-282A-A
ALIGNMENT AND SYMMETRY - UNSCHEDULED INSPEC-
TIONS
PC-12/47E AMM Doc No 02300, ISSUE 01 REVISION 26 MSN 545, 1001-1719,
1721-1999
12-B-AM-00-00-00-I
UNCLASSIFIED
Effectivity: All
12-B-05-50-00-00A-018A-A
UNCLASSIFIED
2021-12-04 Page 1