
74
Escala BL460 -
Problem Determination and Service Guide
•
If the system hangs on a progress code, follow the suggested actions in the order in which they are listed
in the Action column until the problem is solved. If an action solves the problem, you can stop performing
there maining actions.
•
See
Chapter 3
, “
Parts listing
,” on page
197
to determine which components are CRUs and which
components are FRUs.
Progress code
Description
Action
C1009x38
Processor check ring IPL step in progress
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
C1009x39
Processor L2 line delete in progress
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
C1009x3A
Load processor gptr IPL step in progress
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
C1009x3C
Processor ABIST step in progress
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
C1009x40
Processor LBIST step in progress
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “Replacing the Tier 2 system-
board and chassis assembly” on page 258.
C1009x44
Processor array initialization step in
progress
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
C1009x46
Processor AVP initialization step in
progress
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
C1009x48
Processor flush IPL step in progress
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
C1009x4C
Processor wiretest IPL step in progress
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “Replacing the Tier 2 system-
board and chassis assembly”on page 258.
C1009x50
Processor long scan IPL step in progress
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
C1009x54
Start processor clocks IPL step in
progress
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
C1009x58
Processor SCOM initialization step in
progress
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
C1009x5C
Processor interface alignment procedure
in progress
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
Содержание Escala BL460
Страница 1: ...Escala BL460 Problem Determination and Service Guide ESCALA Blade REFERENCE 86 A7 81FB 00...
Страница 2: ......
Страница 10: ......
Страница 11: ...Preface vii Safety...
Страница 13: ...Preface ix...
Страница 14: ...x Escala BL460 Problem Determination and Service Guide...
Страница 15: ...Preface xi...
Страница 16: ...xii Escala BL460 Problem Determination and Service Guide...
Страница 17: ...Preface xiii...
Страница 19: ...Preface xv Guidelines for servicing electrical equipment...
Страница 20: ......
Страница 26: ...6 Escala BL460 Problem Determination and Service Guide Figure 1 1 DIMM connectors...
Страница 33: ...Chapter 1 Introduction 13 Figure 1 4 shows individual DIMM connectors Figure 1 4 DIMM connectors...
Страница 220: ...200 Escala BL460 Problem Determination and Service Guide...
Страница 260: ...240 Escala BL460 Problem Determination and Service Guide...
Страница 265: ......
Страница 266: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A7 81FB 00...