
106
Escala BL460 -
Problem Determination and Service Guide
•
If the system hangs on a progress code, follow the suggested actions in the order in which they are listed
in the Action column until the problem is solved. If an action solves the problem, you can stop performing
theremaining actions.
•
See
Chapter 3
, “
Parts listing
,” on page
197
to determine which components are CRUs and which
components are FRUs.
Progress code
Description
(Command Being Processed)
Action
D1xx3y03
Get array values
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
D1xx3y04
Stop the clocks
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
D1xx3y05
Flush the cache
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
D1xx3y06
Get CFAM
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
D1xx3y07
Put SCOM
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
D1xx3y08
Send command
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
D1xx3y09
Get optimized cache
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
D1xx3y0A
Get general purpose (GP) register
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
D1xx3y0B
Processor clean-up
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
D1xx3y0C
Get JTAG register
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
D1xx3y0D
Stop clocks without quiescing
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
D1xx3yF0
Memory collection set-up
1. Go to “
Checkout procedure
” on page
148
.
2. Replace the system-board and chassis assembly,
as described in “
Replacing the Tier 2 system-
board and chassis assembly
” on page
229
.
Содержание Escala BL460
Страница 1: ...Escala BL460 Problem Determination and Service Guide ESCALA Blade REFERENCE 86 A7 81FB 00...
Страница 2: ......
Страница 10: ......
Страница 11: ...Preface vii Safety...
Страница 13: ...Preface ix...
Страница 14: ...x Escala BL460 Problem Determination and Service Guide...
Страница 15: ...Preface xi...
Страница 16: ...xii Escala BL460 Problem Determination and Service Guide...
Страница 17: ...Preface xiii...
Страница 19: ...Preface xv Guidelines for servicing electrical equipment...
Страница 20: ......
Страница 26: ...6 Escala BL460 Problem Determination and Service Guide Figure 1 1 DIMM connectors...
Страница 33: ...Chapter 1 Introduction 13 Figure 1 4 shows individual DIMM connectors Figure 1 4 DIMM connectors...
Страница 220: ...200 Escala BL460 Problem Determination and Service Guide...
Страница 260: ...240 Escala BL460 Problem Determination and Service Guide...
Страница 265: ......
Страница 266: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A7 81FB 00...