BE1-CDS220 Installation
12-15
Notes for Figure 12-18:
With the appropriate transformer and CT connection information, the relay can automatically determine the required
compensation. The relay can accommodate any combination of transformer and CT connection (wye, delta AB, or
Delta AC). for more information, refer to Section 3, Input And Output Functions, Input Current.
Optional independent ground input (
I
G
) can be connected for overcurrent or neutral differential protection. For more
information on connection details, see the following figures on optional ground inputs.
Phase, Residual, and
I
2
overcurrent elements can be connected to either CT circuit for backup protectiion. For more
information on applying overcurrent backup, refer to Section 8, Application.
Overcurrent neutral ground (
I
N
) operates on internally calculated residual (3I0) current.
VTP connections shown are for H1 case. For more information on case connections, refer to the BE1-951 Instruction
Manual, Section 12, Installation.
Four-wire connection shown as typical. For more information on case connections, refer to the BE1-951 Instruction
Manual, Section 12, Installation.
With CT polarity connected to relay polarity, power flow from the high side to the low side is defined as power out and
equals positive watts.
Optional independent ground input can be connected for low side ground faults. For more information on case
connections, refer to the BE1-951 Instruction Manual, Section 12, Installation.
Shown with separate, overlapping CT for independent backup protection.
1
2
3
4
5
6
7
8
9
P0001-04
09-21-00
Содержание BE1-CDS220
Страница 2: ......
Страница 10: ...viii Introduction BE1 CDS220 This page intentionally left blank...
Страница 36: ...ii Quick Start BE1 CDS220 This page intentionally left blank...
Страница 48: ...ii Input And Output Functions BE1 CDS220 This page intentionally left blank...
Страница 66: ...iv Protection and Control BE1 CDS220 This page intentionally left blank...
Страница 112: ...ii Metering BE1 CDS220 This page intentionally left blank...
Страница 116: ...5 4 Metering BE1 CDS220 This page intentionally left blank...
Страница 166: ...ii BESTlogic Programmable Logic BE1 CDS220 This page intentionally left blank...
Страница 176: ...7 10 BESTlogic Programmable Logic BE1 CDS220 This page intentionally left blank...
Страница 234: ...8 56 Application BE1 CDS220 This page intentionally left blank...
Страница 236: ...ii Security BE1 CDS220 This page intentionally left blank...
Страница 240: ...9 4 Security BE1 CDS220 This page intentionally left blank...
Страница 242: ...ii Human Machine Interface BE1 CDS220 This page intentionally left blank...
Страница 256: ...10 14 Human Machine Interface BE1 CDS220 This page intentionally left blank...
Страница 258: ...ii ASCII Command Interface BE1 CDS220 This page intentionally left blank...
Страница 289: ...BE1 CDS220 Installation 12 7 Figure 12 8 MX Case Horizontal Panel Mount Front View Overall Dimensions...
Страница 422: ...14 32 BESTCOMS Software BE1 CDS220 This page intentionally left blank...
Страница 424: ...ii Time Current Characteristics BE1 CDS220 This page intentionally left blank...
Страница 441: ...BE1 CDS220 Time Overcurrent Characteristic Curves A 17 Figure A 13 Time Characteristic Curve A Standard Inverse 99 1621...
Страница 442: ...A 18 Time Overcurrent Characteristic Curves BE1 CDS220 Figure A 14 Time Characteristic Curve B Very Inverse 99 1376...
Страница 443: ...BE1 CDS220 Time Overcurrent Characteristic Curves A 19 Figure A 15 Time Characteristic Curve C Extremely Inverse 99 1377...
Страница 444: ...A 20 Time Overcurrent Characteristic Curves BE1 CDS220 Figure A 16 Time Characteristic Curve G Long Time Inverse 99 1622...
Страница 452: ...ii Terminal Communication BE1 CDS220 This page intentionally left blank...
Страница 456: ...C 4 Terminal Communication BE1 CDS220 This page intentionally left blank...
Страница 458: ...ii Settings Calculations BE1 CDS220 This page intentionally left blank...
Страница 475: ......