Chapter 4: Connecting External Equipment (Optional)
62
2. Move the blade extension strip toward the bottom of the blade
chassis until its mylar section is fully under the chassis, and verify
that the blade extension strip does not fall off easily. If necessary,
you may use the adhesive tape in the back of the mylar section to
help fix the strip in place.
3. Connect one end of an asset tag to a blade server and the other end
to the blade extension strip.
a. Affix the adhesive part of the asset tag to one side of a blade
server through the tag's tape.
b. Plug the tag connector of the asset tag into a tag port on the
blade extension strip.
4. Repeat the above step until all blade servers in the chassis are
connected to the blade extension strip via asset tags.
Summary of Contents for PX2-1000 SERIES
Page 5: ......
Page 71: ...Chapter 4 Connecting External Equipment Optional 52...
Page 231: ...Chapter 6 Using the Web Interface 212 8 Click OK...
Page 589: ...Appendix I RADIUS Configuration Illustration 570 Note If your PX uses PAP then select PAP...
Page 594: ...Appendix I RADIUS Configuration Illustration 575 14 The new attribute is added Click OK...
Page 595: ...Appendix I RADIUS Configuration Illustration 576 15 Click Next to continue...
Page 627: ...Appendix K Integration 608 3 Click OK...
Page 647: ...Index 629 Z Zero U Connection Ports 74 Zero U Products 2...