8-160
1. TRACK LINK
REMOVAL
Move track link until master pin is over
front idler in the position put wooden
block as shown.
Loosen tension of the track link.
If track tension is not relieved when the
grease valve is loosened, move the
machine backwards and forwards.
Unscrew the grease nipple after release
the tension by pushing the poppet only
when necessarily required.
Grease leaking hole is not existing. So,
while unscrew the grease nipple, grease
is not leaking until the grease nipple is
completely coming out. If the tension is
not released in advance, the grease
nipple can be suddenly popped out by
pressurized grease.
Push out master pin by using a suitable
tool.
GROUP 10 UNDERCARRIAGE
90 ~ 110
1)
(1)
(2)
侍
侍
(3)
Master pin
Block
8-161(1)
1408DA100
14098UC05
INSTALL
Carry out installation in the reverse order
to removal.
Adjust the tension of the track link.
2)
(1)
侍
Move the machine slowly in reverse, and
lay out track link assembly (1).
Jack up the machine and put wooden
block under the machine.
Don't get close to the sprocket side as the
track shoe plate may fall down on your
feet.
(4)
侍
侍
Summary of Contents for HX140L
Page 12: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Page 209: ...4 5 MEMORANDUM...
Page 694: ...8 68 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Page 734: ...8 108 Assemble plug 2 Plug NPT1 16 11 EA 17 21078TM68 21078TM69 21078TM70 21078TM71...
Page 756: ...8 130 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...