8-154
Piston assy
Wooden block
19
18
13 14
20 21
Pull straight
Lift with a crane
Plastic
hammer
Remove the cylinder head assembly
from rod assembly (2).
If it is too heavy to move, move it by
striking the flanged part of cylinder head
with a plastic hammer.
Pull it straight with cylinder head
assembly lifted with a crane.
Exercise care so as not to damage the
lip of rod bushing
(4) and packing
(5,6,7,8,9,10) by the threads of rod
assembly (2).
Remove piston and cylinder head
Remove set screw (21).
Since set screw (21) and lock nut (20) is
tightened to a high torque, use a
hydraulic and power wrench that utilizers
a hydraulic cylinder, to remove the lock
set screw (21) and lock nut (20).
Remove piston assembly (14), back up
ring (19), and O-ring (18).
到
侍
侍
Place the removed rod assembly on a
wooden V-block that is set level.
Cover a V-block with soft rag.
刲
侍
Note that the plated surface of rod
assembly (2) is to be lifted. For this
reason, do not use a wire sling and
others that may damage it, but use a
strong cloth belt or a rope.
(2)
刮
侍
刯
21078DA33
14W98CY11
21078DA35
Summary of Contents for HX140L
Page 12: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Page 209: ...4 5 MEMORANDUM...
Page 694: ...8 68 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Page 734: ...8 108 Assemble plug 2 Plug NPT1 16 11 EA 17 21078TM68 21078TM69 21078TM70 21078TM71...
Page 756: ...8 130 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...