5-2
SYSTEM DIAGRAM
Travel speed
Power boost
Main pump
Pilot pump
Engine
ECM
CAN #1
MCV
RH control
lever
LH control
lever
One touch
decel button
Power boost
button
Horn button
Option
button
Work
pressure
Travel
pressure
SOLENOID VALVE
Attachment
pressure(opt)
Attachment
conflux(opt)
Attachment
safety(opt)
Arm regen
Attachment pilot
pressure
EPPR VALVE
Boom priority
EPPR
Attachment
flow EPPR
MCU
P1
pressure
P2
pressure
P1
P2
P3
EPPR
pressure
Overload
pressure
sensor
SL
SR
Swing
pressure
AO
AI
Arm in/out
& Bucket in
pressure
BI
Boom
down
pressure
BD
Work tool
Cluster
CAN #1 & #2
Pressure signal
Pressure signal
Pressure signal
Drive signal
Pressure signal
Signal
Drive signal
Normal
CN-16
Emergency
CN-16A
CN-16B
Pump power
shift EPPR
Boom cylinder
Shuttle
block
Switch signal
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
Camera
Haptic controller
PS
Arm in
pressure
CLUSTER
AIRCON
OFF
PS
Negacon 1
pressure
Negacon 2
pressure
BU
PS
Boom up
pressure
Option
Arm 1
Boom 2
Swing
Bucket
Arm 2
Arm regen
Boom 1
Option
Travel(RH)
Travel(LH)
(Dozer)
140L5MS04
Summary of Contents for HX140L
Page 12: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Page 209: ...4 5 MEMORANDUM...
Page 694: ...8 68 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Page 734: ...8 108 Assemble plug 2 Plug NPT1 16 11 EA 17 21078TM68 21078TM69 21078TM70 21078TM71...
Page 756: ...8 130 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...