![Hyundai HX140L Manual Download Page 773](http://html.mh-extra.com/html/hyundai/hx140l/hx140l_manual_2196330773.webp)
8-147
7
6
8
9
Install
Carry out installation in the reverse order
to removal.
When aligning the mounting position
of the pin, do not insert your fingers in
the pin hole.
Bleed the air from the boom cylinder.
Conformed the hydraulic oil level and
check the hydraulic oil leak or not.
刮
侍
侍
(2)
Remove bolt (9) and pull out pin (8).
Remove boom cylinder assembly (6).
余
Weight : 130 kg (285 lb)
刳
刴
Disconnect boom cylinder hoses (7) and
put plugs on cylinder pipe.
刲
145WF8DA25
145WF8DA26
Summary of Contents for HX140L
Page 12: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Page 209: ...4 5 MEMORANDUM...
Page 694: ...8 68 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Page 734: ...8 108 Assemble plug 2 Plug NPT1 16 11 EA 17 21078TM68 21078TM69 21078TM70 21078TM71...
Page 756: ...8 130 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...