2-1
Installation
Initial Inspection
2
Installation
Initial Inspection
WA R N I N G
TO AVOID HAZARDOUS ELECTRICAL SHOCK, DO NOT
PERFORM ELECTRICAL TESTS WHEN THERE ARE SIGNS OF
SHIPPING DAMAGE TO ANY PORTION OF THE OUTER
ENCLOSURE (COVERS, PANELS, METERS).
Inspect the shipping container for damage. If the shipping container or
cushioning material is damaged, it should be kept until the contents of
the shipment have been checked for completeness and the instrument
has been checked both mechanically and electrically. Procedures for
checking electrical operation are given in the Calibration manual. If the
contents of the shipment are incomplete, if there is mechanical damage
or defect, notify the nearest Hewlett-Packard Office. If the instrument
does not pass the electrical performance tests given in the Calibration
manual, notify the nearest Hewlett-Packard office. If the shipping
container is also damaged, or the cushioning material shows signs of
stress, notify the carrier as well as the nearest Hewlett-Packard office.
Keep the shipping materials for the carrier’s inspection. The Hewlett-
Packard office will arrange for repair or replacement without waiting for
claim settlement.
Summary of Contents for 37717C
Page 2: ...HP 37717C Communications Performance Analyzer Calibration Manual ...
Page 5: ...2 ...
Page 21: ...xviii Contents ...
Page 109: ...2 20 Installation Additional Precautions for Service Engineers ...
Page 312: ...3 203 Performance Tests Trigger Output Option UKZ Figure 3 57 Monitor Input Test Setup ...
Page 375: ...3 266 Performance Tests Performance Test Record ...
Page 379: ...4 4 Installation Current Previous Terminology ...
Page 392: ...B 9 Appendix B Fitting Calibrating Testing New Modules Typical Jitter Transmit Spectrum ...
Page 393: ...B 10 Appendix B Fitting Calibrating Testing New Modules ...