E L C P r o g r a m m i n g M a n u a l
F o r m o r e i n f o r m a t i o n v i s i t :
w w w. e a t o n . c o m
M N 0 5 0 0 3 0 0 3 E
3 - 3 3 6
Program Example 2:
1. Timing diagram and program control:
Y0
Y1
D0=k40
D0=k10
4sec
2sec
1
2
3
4
M0
T0
5sec
D0=
k-1
M0
K50
CVM
D0
K50
Y0
D0
T0
TMR
MOV
k-1
T0
2. Control
phases:
1) Phase
1
: When M0 = On, because the valve position is not known, set D0 = K-1 to
deliberately close the valve (Y0 = Off, Y1 = On) for 5 seconds and make sure the valve is
at the position of 0 seconds before moving on to the next step.
2) Phase
2
: When T0 = On, allow D0 = K40 to begin execution. Open the valve (Y0 = On,
Y1 = Off) for 4 seconds, moving the valve to the position of 4 seconds.
3) Phase
3
: Change the position of the valve and make D0 = K10. Because the previous
position was at 4 seconds, the valve shall be closed (Y0 = Off, Y1 = On) for 3 seconds,
moving the valve to the position of 1 second.
4) Phase
4
: Switch off M0 and the valve will no longer move (Y0 = Off, Y1 = Off).
Summary of Contents for ELC-PB
Page 1: ......
Page 5: ...For more information visit www eaton com MN05003003E iv...
Page 29: ...ELC Programming Manual For more information visit www eaton com MN05003003E 1 24 MEMO...
Page 502: ...3 Instruction Set MN05003003E For more information visit www eaton com 3 333...
Page 601: ...ELC Programming Manual For more information visit www eaton com MN05003003E 3 432...
Page 625: ...ELC Programming Manual For more information visit www eaton com MN05003003E 3 456...