S
2M
Connector Module
Configuration
68
On the OpenCom 150 the pressure terminal is a 5-pin connector. The addi-
tional terminal is used to connect the shielding of a shielded line. The shielding
has to be stripped as short as possible (approx. 3 mm).
6.
If necessary, check to make sure that the NT is fed by its own power supply.
7.
Reconnect the OpenCom 130/150 to the power supply.
8.
Configure the S
2M
module in the
Configurator
of the OpenCom 130/150 (refer
to
Configuration
starting on page 73).
Check the level 1 status with reference to
the LEDs on the module. None of the LEDs are illuminated before the S
2M
module has been configured.
9.
Pull out the mains plug of the OpenCom 130/150 again and close the housing.
10.
Reconnect the OpenCom 130/150 to the power supply.
5.2
Configuration
The menu item
S
2M
appears in the
Configurator
, menu
PBX Configuration: Ports
after installation of the S
2M
module. Configure the port in the input mask of this
menu item. Further information on this can be found in the online help.
LED
Meaning
1 (green)
Synchronous (= ok)
2 (green)
Blue alarm
3 (yellow)
Remote alarm or out of sync
(yellow alarm)
4 (red)
Loss of signal (red alarm)
Summary of Contents for OpenCom 130
Page 1: ...130 OpenCom100 131 150 Mounting and Commissioning User Guide ...
Page 10: ...8 ...
Page 202: ...Index 200 Notes ...
Page 203: ......