![Agilent Technologies E5070B User Manual Download Page 118](http://html.mh-extra.com/html/agilent-technologies/e5070b/e5070b_user-manual_2868065118.webp)
112
Chapter 4
Calibration
THRU Response Calibration (transmission test)
Step 8.
Press
Thru
to start the calibration measurement.
Step 9.
If an isolation calibration must be performed using a LOAD standard, follow the procedure
below.
a.
Connect a LOAD standard to each of the two test ports (connectors to which the DUT
is to be connected) selected in Step 6.
Figure 4-10
Connecting the LOAD standard
b.
Press
Isolation (Optional)
to start the calibration measurement.
Step 10.
Press
Done
to terminate the response calibration (and the LOAD isolation calibration)
process. Upon pressing this key, calibration coefficients will be calculated and saved. The
error correction function will also be automatically enabled.
Summary of Contents for E5070B
Page 6: ......
Page 30: ...24 Contents ...
Page 34: ...28 Chapter1 Precautions Before contacting us ...
Page 286: ...280 Chapter6 Data Analysis Using the Equation Editor ...
Page 430: ...424 Chapter12 Optimizing Measurements Performing a Segment by Segment Sweep segment sweep ...
Page 538: ...532 Chapter15 Measurement Examples Executing Power Calibration ...
Page 634: ...628 AppendixB Troubleshooting Warning Message ...
Page 732: ...726 AppendixD Softkey Functions Trigger Menu ...
Page 740: ...734 AppendixE General Principles of Operation Data Processing ...
Page 760: ...754 AppendixF Replacing the 8753ES with the E5070B E5071B Comparing Functions ...