![horiba TPNA-500 Скачать руководство пользователя страница 67](http://html1.mh-extra.com/html/horiba/tpna-500/tpna-500_instruction-manual_2162279067.webp)
Operation
51
7.
Remove the nozzle unit for reagent B, and then replace it with a reagent bottle filled
with pure water.
8.
After the bottle replacement, perform the following operation.
9.
Press [SEPARATE ACTION] in the MAINTENANCE screen (refer to “ SEPARATE
ACTION” (page 119)).
The SEPARATE ACTION screen will be displayed.
10.
Press [Gage Reag. B] in the SEPARATE ACTION 1/5 screen to start the operation.
11.
Perform cleaning for reagent A, reagent F, reagent C, reagent D, reagent E, and
span solution in the same manner as above. Store the removed reagent bottles in a
cool and dark place.
12.
Use a beaker, etc., to hold the nozzle unit for each reagent line.
13.
Perform the following operation.
14.
Press [SEPARATE ACTION] in the MAINTENANCE screen.
15.
Press [Discharge all] in the SEPARATE ACTION 5/5 screen.
16.
When the operation is completed, press [SHUTDOWN] on the POWER menu.
17.
Turn OFF the power switch and main power switch.
18.
Clean the overflow tank.
Reagent B bottle
Bottle filled with
pure water
Label: Blue
[MENU]
Main
Refer to “ To display the [MENU] item screen” (page 62).
[SETTING]
MENU
MAINTENANCE
[MENU]
Main
Refer to “ To display the [MENU] item screen” (page 62).
[SETTING]
MENU
MAINTENANCE
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......