
Function
117
STEP ACTION
Allows you to perform each of the specified sequence operations individually within the
desired range.
Operation procedure
1.
Press [STEP ACTION] in the MAINTENANCE screen.
The STEP ACTION SET screen will be displayed.
2.
Select the measurement line and press [DECIDE].
3.
Select the start/end sequence and press [DECIDE].
4.
Press [START].
The specified sequence will be executed.
Item
Setting range
Default value
Description
Measure Line
Measure L1
Measure L1
Selects the target.
Measure L2
Meas.L1-HCl
Meas.L2-HCl
ZERO Cal.
SPAN Cal.
Cleaning
Pre-Wash
Post-Wash
Preprocess
Start Sequence Allows you to select the process
from the screen. For details on
the process, refer to “ Time
chart” (page 233).
Drain Sample-Chk
Specifies the start
process.
End Sequence
Tube to P-cell-2
Specifies the end
process.
Note: L2 can be selected only for the two-point meter specification.
Note: “Cleaning” is not supported.
[MENU]
Main
Refer to “ To display the [MENU] item screen” (page 62).
[SETTING]
MAINTENANCE
MENU
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......