![horiba TPNA-500 Скачать руководство пользователя страница 229](http://html1.mh-extra.com/html/horiba/tpna-500/tpna-500_instruction-manual_2162279229.webp)
Maintenance
213
12.
Fasten the knurled screws (3 locations) for the dilution tube retaining plate firmly.
13.
Connect the PharMed tube to the FEP tube.
14.
Return the pinch valve to its original position, and then tighten the screws (2
locations).
At this point, be sure that the PharMed tube goes inside the tube through position
of the pinch valve.
15.
Clean the cell measurement tube as necessary in the same manner as above.
16.
Reattach the front cover of the measurement section.
17.
After the cleaning, turn ON the power to the equipment and perform calibration.
Pinch valve
Dilution tube
Cell measurement tube
Screws
(2 locations)
PharMed tube
FEP tube
Tube through position
Slide the pinch
valve to the
original position
on the right.
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......