
Preparation for Operation
41
Attachment of the pure water cartridge (For the built in pure water cartridge)
1.
Take out the two caps attached on the in/out ports of the pure water cartridge.
2.
Pull down the safety lever and push in the pure water cartridge with the in/out
ports heading forward, then pull up the safety lever.
Note
If the safety lever can not be pulled up, the pure water cartridge may be inserted incompletely, push it
again.
Two caps
The in/out ports of
the pure water cartridge
Push in
Safety lever
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......