![horiba TPNA-500 Скачать руководство пользователя страница 213](http://html1.mh-extra.com/html/horiba/tpna-500/tpna-500_instruction-manual_2162279213.webp)
Maintenance
197
6.
Once the operation is completed, replace the reagent bottles with new ones for all
the reagent lines, and set the bottles in the reagent tray as instructed on the
screen. Return the reagent tray to its original position and tighten the knurled
screw (one location). After the procedure, press [YES].
Note
When replacing, check that the color of the tube connected to the nozzle unit matches that of the
reagent bottle label.
7.
After the operation has been completed, press [YES] and perform calibration. For
details on the calibration procedure, refer to “ [START]” (page 157).
Once the operation is completed, the remaining amount of reagent is reset.
Nozzle unit
Tightening cap
Cap
Replacement example of
reagent C bottle
Label: Black
Tube: Black
REAG.
Reagent capacity Label color
Reagent A
1000 mL
White
Reagent B
250 mL
Blue
Reagent C
250 mL
Black
Reagent D
250 mL
Yellow
Reagent E
250 mL
Orange
Reagent F
250 mL
Red
Span
solution
1000 mL
Green
Remove
Knurled screw
Reagent B
Reagent D
Span solution
Reagent F
Reagent E
Reagent C
Reagent tray
Reagent A
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......