![horiba TPNA-500 Скачать руководство пользователя страница 256](http://html1.mh-extra.com/html/horiba/tpna-500/tpna-500_instruction-manual_2162279256.webp)
Material
240
When AUTO HCl WASH is ON
When AUTO HCl WASH is set ON, the following operation is executed instead, only for the
processes whose accumulated time is between 17:21 to 18:26. For any other operations, the
same operation as that when AUTO HCl WASH is set OFF is performed.
Serial
No.
TP measurement
range: 50 mg/L
Process
time (sec)
Accumulated
time (sec)
Accumulated
time
(min:sec)
Serial
No.
TN measurement range:
200 mg/L
Process
time (sec)
Accumulated
time (sec)
Accumulated
time
(min:sec)
6
Gauge Samp. L1
(Gauge Span Water) *1
26
106
01:46
34
Gauge Samp. L1
(Gauge Span Water) *1
26
598
09:58
7
Gauge Blank-4
25
131
02:11
35
Gauge Blank-4
25
623
10:23
8
Pour Dilute.Tube4
15
146
02:26
36
Pour Dilute.Tube4
15
638
10:38
9
Gauge Blank-4
25
171
02:51
37
Gauge Blank-4
25
663
11:03
10
Pour Dilute.Tube4
15
186
03:06
38
Pour Dilute.Tube4
15
678
11:18
11
Stir Dilute.Tube
5
191
03:11
39
Stir Dilute.Tube
5
683
11:23
12
Gauge Dilute.Tube
20
211
03:31
40
Gauge Dilute.Tube
20
703
11:43
13
Gauge Blank-4
25
236
03:56
41
Gauge Blank-4
25
728
12:08
14
Pour Dilute.Tube4
15
251
04:11
42
Pour Dilute.Tube4
15
743
12:23
15
Gauge Blank-4
25
276
04:36
43
Gauge Blank-4
25
768
12:48
16
Pour Dilute.Tube4
15
291
04:51
44
Pour Dilute.Tube4
15
783
13:03
17
Stir Dilute.Tube
5
296
04:56
45
Stir Dilute.Tube
5
788
13:08
Serial
No.
TP measurement
range: 100/250 mg/L
Process
time (sec)
Accumulated
time (sec)
Accumulated
time
(min:sec)
Serial
No.
TN measurement range:
500/1000 mg/L
Process
time (sec)
Accumulated
time (sec)
Accumulated
time
(min:sec)
6
Gauge Samp. L1
(Gauge Span Water) *1
26
106
01:46
34
Gauge Samp. L1
(Gauge Span Water) *1
26
598
09:58
7
Gauge Blank Water-12
50
156
02:36
35
Gauge Blank Water-12
50
648
10:48
8
Pour Dilute.Tube12
30
186
03:06
36
Pour Dilute.Tube12
30
678
11:18
9
-
0
186
03:06
37
-
0
678
11:18
10
-
0
186
03:06
38
-
0
678
11:18
11
Stir Dilute.Tube
5
191
03:11
39
Stir Dilute.Tube
5
683
11:23
12
Gauge Dilute.Tube
20
211
03:31
40
Gauge Dilute.Tube
20
703
11:43
13
Gauge Blank Water-12
50
261
04:21
41
Gauge Blank Water-12
50
753
12:33
14
Pour Dilute.Tube12
30
291
04:51
42
Pour Dilute.Tube12
30
783
13:03
15
-
0
291
04:51
43
-
0
783
13:03
16
-
0
291
04:51
44
-
0
783
13:03
17
Stir Dilute.Tube
5
296
04:56
45
Stir Dilute.Tube
5
788
13:08
When AUTO HCl WASH is set ON
Process time
(sec)
Accumulated
time (sec)
Accumulated
time (min:sec)
The same operation as that when AUTO HCl WASH
is set OFF is performed.
-
-
up to 17:06
Suck HCl
15
1041
17:21
Stir Dilute.Tube
5
1046
17:26
Standby
20
1066
17:46
Standby
15
1081
18:01
Standby
25
1106
18:26
The same operation as that when AUTO HCl WASH
is set OFF is performed.
-
-
up to 58:50
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......