![horiba TPNA-500 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/horiba/tpna-500/tpna-500_instruction-manual_2162279018.webp)
Before Using the Product
2
Names of each part
Analyzer
1
5
6
2
4
[Models equipped with a pure water tank]
[When open]
3
Refer to page 3.
No.
Name
Description
1
Operation section
Refer to “ Operation section” (page 5).
2
Electrical wiring service
entrance
A service entrance for electrical wiring.
3
Input/output terminal
Power supply cable and signal lines are brought into the equipment here.
4
Main power switch
(Ground fault interrupter)
Turns ON/OFF the power to the equipment.
5
Waste liquid tank
The amount of waste liquid is approximately 17 L per month. Includes alarm output
contact terminals to activate a “Full Drain Tank” alarm when the tank reaches full capacity.
Tank capacity is 20 L. Check level in the tank and dispose of waste liquid as necessary.
6
Pure water tank
Storage capacity is approximately 20 L of pure water. Amount of pure water
consumed is approximately 40 L per month (depending on measurement range).
Includes alarm output contact terminals to activate a “Lack Blank” alarm when the
amount of pure water remaining is insufficient (not needed for units that use tap water
for the water supply or for units with built-in pure water unit).
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......