
Material
236
Sequence: Measurement/span calibration
Tip
The following sequence process table applies to the case in which the TP measurement range is
10 mg/L and TN measurement range is 50 mg/L.
Only the processes of serial nos. 6 to 17 vary according to the TP measurement range. Only the
processes of serial nos. 34 to 45 vary according to the TN measurement range (shaded columns).
Refer to the process that corresponds to the measurement range being used.
When sequence operation is performed for line 2, the process name indicates “L2”, instead of
“L1”.
*1: During span calibration sequence, the process name indicated in brackets is displayed.
A part of the display of “Drain Sample” in serial nos. 1, 30, 58, and 71 varies depending on the
setting conditions. For details, refer to “ Drain Sample” (page 241).
The “Line Blow L1” process in serial no. 68 is not performed in the off-line mode.
Serial
No.
TP measurement range: 10 mg/L
TN measurement range: 50 mg/L
Process
time (sec)
Accumulated
time (sec)
Accumulated
time
(min:sec)
1
Drain Sample L1
20
20
00:20
2
Drain Blank
20
40
00:40
3
Drain water P-cell
10
50
00:50
4
Inject to P-cell
20
70
01:10
5
Drain water P-cell
10
80
01:20
6
Gauge Samp. L1
(Gauge Span Water) *1
26
106
01:46
“ Corresponding
process to each
TP/TN
measurement
range” (page
239)
7
Gauge Blank Water-12
50
156
02:36
8
Pour Dilute.Tube12
30
186
03:06
9
-
0
186
03:06
10
-
0
186
03:06
11
Stir Dilute.Tube
5
191
03:11
12
Standby
20
211
03:31
13
Standby
80
291
04:51
14
15
16
17
Stir Dilute.Tube
5
296
04:56
18
Press Blow
3
299
04:59
19
Gauge Meas.Tube-1
30
329
05:29
20
Tube to P-cell-1
15
344
05:44
21
Drain water P-cell
10
354
05:54
22
Gauge Meas.Tube-1
30
384
06:24
23
Tube to P-cell-1
15
399
06:39
24
Drain water P-cell
10
409
06:49
25
Gauge Meas.Tube-1
30
439
07:19
26
Tube to P-cell-1
15
454
07:34
27
P Inject Reag. A
26.5
481
08:00
28
P Inject Reag. C
26.5
507
08:27
29
Stir P-cell
5
512
08:32
30
Drain Sample L1
20
532
08:52
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......