
Maintenance
204
Supplying pure water into the pure water tank (for models equipped with a
pure water tank)
If only insufficient pure water remains in the pure water tank, measurement cannot be
performed correctly. Periodically check the remaining amount and supply pure water as
necessary.
Note
The pure water consumption differs depending on the measurement range, and therefore, the supply
cycle listed below should only be used as a guide. Use the table below for reference.
Pure water supply cycle (guide)
Target
Pure water tank
Procedure
Inspection/replacement
Cycle/timing (guide)
12 days
TP measurement
range (mg/L)
TN measurement range (mg/L)
2
5
10
20
50
100
200
500
1000
0.5
21
21
19
19
16
-
-
-
-
1
21 21 19 19 16 18 -
-
-
2
19 19 18 18 15 16 14 -
-
5
19 19 18 18 15 16 14 12 -
10
16 16 15 15 13 14 12 11 11
20
-
18 16 16 14 15 13 11 11
50
-
-
14 14 12 13 11 10 10
100
-
-
- 12 11 11 10 9 9
200
-
-
-
-
11
11
10
9
9
Unit: Day
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......