
Maintenance
210
3.
Remove the front cover of the measurement section.
4.
Loosen the two screws securing the pinch valve at the bottom of the dilution tube.
Then, slide it to the left while holding the PharMed tube below the pinch valve.
5.
Remove the FEP tube from the PharMed tube.
Screws
Front cover
[Measurement section]
Pinch valve
Dilution tube
Cell measurement tube
Screws
(2 locations)
Slide to
the left
PharMed tube
FEP tube
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......