
Operation
48
For initial operation
When you operate the equipment without performing calibration, the measurement values are
calculated according to the calibration data obtained at the factory.
As the calibration values vary depending on the installation environment, the correct values
may not be displayed.
It is recommended that you perform calibration before measurement.
Note
Check that the meter is installed correctly.
For installation, refer to the attached Installation Work Procedure.
According to the total pollutant load control enacted by Japan's Ministry of the Environment for
factories that discharge waste liquid to the closed water area, if there is no correlation among
the measurement values obtained by the automatic total nitrogen/phosphorus monitoring
system, manual analysis defined by 45 and 46 for JIS K0102 (measurement value obtained by
the specified measurement method), and the TPNA-500, the following conversion formula
should be used.
The conversion formula is expressed as follows:
y = a + bx
Here, the variables x and y represent the following:
x: Measurement value obtained by the automatic total nitrogen/phosphorus monitoring
system
y: Equivalent
The value of “y” is regarded as the TP/TN value obtained by the specified measurement
method.
Reference
For details on how to input coefficients a and b, refer to “ CONV. COEF. SET” (page 77).
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......