
Material
234
Sequence: Preprocess, Pre-Wash, Post-Wash
Tip
When sequence operation is performed for line 2, the process name indicates “L2”, instead of
“L1”.
A part of the display of “Drain Sample” in serial no. 1 varies depending on the setting conditions.
For details, refer to “ Drain Sample” (page 241).
If measurement or calibration is stopped in the middle of the process, pre-processing will be
performed before the next measurement or calibration.
Serial
No.
No.
Preprocess
Process
time (sec)
Accumulat
ed time
(sec)
Accumulat
ed time
(min:sec)
Serial
No.
Pre-Wash/Post-Wash
Process
time (sec)
Accumulat
ed time
(sec)
Accumulat
ed time
(min:sec)
1
Drain Sample-Chk
20
20
00:20
1
Drain Sample-Chk
20
20
00:20
2
Drain Blank
20
40
00:40
2
Drain Blank
20
40
00:40
3
Drain Blank
20
60
01:00
3
Drain water P-cell
10
50
00:50
4
Wastewater P-cell
10
70
01:10
4
Drain water N-cell
10
60
01:00
5
Wastewater N-cell
10
80
01:20
5
Gauge Blank Water-12
50
110
01:50
6
Tube to P-cell-1
15
95
01:35
6
Pour Dilute.Tube12
30
140
02:20
7
Wastewater P-cell
10
105
01:45
7
Stir Dilute.Tube
5
145
02:25
8
Inject to P-cell
20
125
02:05
8
Gauge Blank Water-12
50
195
03:15
9
Drain water P-cell
10
135
02:15
9
Gauge Meas.Tube-1
30
225
03:45
10
Drain Reag. A
40
175
02:55
10
Tube to P-cell-1
15
240
04:00
11
Drain Reag. B
30
205
03:25
11
Drain water P-cell
10
250
04:10
12
Drain Reag. F
30
235
03:55
12
Gauge Meas.Tube-2
5
255
04:15
13
Drain Reag. C
30
265
04:25
13
P Stir Meas.Tube
5
260
04:20
14
Drain Reag. D
30
295
04:55
14
Tube to P-cell-2
15
275
04:35
15
Drain Reag. E
40
335
05:35
15
Gauge Meas.Tube-1
30
305
05:05
16
Gauge Blank Water-12
50
385
06:25
16
N Stir Meas.Tube
5
310
05:10
17
Pour Dilute.Tube12
30
415
06:55
17
Tube to N-cell-1
15
325
05:25
18
Stir Dilute.Tube
5
420
07:00
18
Drain water N-cell
10
335
05:35
19
Gauge Blank Water-12
50
470
07:50
19
Gauge Meas.Tube-2
5
340
05:40
20
Gauge Meas.Tube-1
30
500
08:20
20
N Stir Meas.Tube
5
345
05:45
21
Tube to P-cell-1
15
515
08:35
21
Tube to N-cell-2
30
375
06:15
22
Drain water P-cell
10
525
08:45
23
Gauge Meas.Tube-2
5
530
08:50
24
P Stir Meas.Tube
5
535
08:55
25
Tube to P-cell-2
15
550
09:10
26
Gauge Meas.Tube-1
30
580
09:40
27
N Stir Meas.Tube
5
585
09:45
28
Tube to N-cell-1
15
600
10:00
29
Wastewater N-cell
10
610
10:10
30
Gauge Meas.Tube-2
5
615
10:15
31
N Stir Meas.Tube
5
620
10:20
32
Tube to N-cell-2
30
650
10:50
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......