
Maintenance
201
Replacement of the pure water cartridge (For the built in pure water
cartridge)
The water not purified well will make the measurement erroneous. If the pure water cartridge
is degraded, replace it.
Note
The period for the replacement of the cartridge will be changed depending on the quality of
supply water. Period listed above is just as a suggestion.
Stop measuring mode and put on the maintenance switch before replacing the cartridge.
When the instrument is OFF for more than 2 days the “Pure water cartridge” alarm will be issued.
When the alarm is issued, purge out the residual water with pure water in the piping.
Check
1.
Check if the “Pure water cartridge” is issued on the screen.
2.
Press
【
MENU
】
-
【
MAINTENANCE
】
-
【
SEPARATE ACTION
】
-
【→】
on the screen.
The SEPARATE ACTION 5/5 menu will be opened.
3.
Press
【
Pure water purge
】
to start purging of the pure water cartridge.
Basic purge time ; about 5 minutes
(Depending on the water quality of the tap water)
Subject
Pure water cartridge
Pure water cartridge
Check/replace
Period (Standard)
6 months - 12 months
【
MENU
】
【
MAINTENANCE
】
Main screen
MENU
MAINTENANCE
【
SEPARATE ACTION
】
SEPARATE ACTION 5/5
【→】
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......