
Material
233
Time chart
The following is a time chart of this equipment.
Sequence
Process time
[m:s]
Details
Preprocess
10:50
“ Sequence: Preprocess, Pre-Wash, Post-Wash”
(page 234)
Pre-Wash/Post-Wash
6:15
ZERO Cal.
58:50
“ Sequence: Zero calibration” (page 235)
Meas./SPAN Cal.
58:50
“ Sequence: Measurement/span calibration” (page
236)
WASH E-LINE
2:18
Not supported.
SEPARATE
ACTION
1
Gage Reag. B
0:26
2
Gage Reag. F
0:26
3
Gage Reag. C
0:26
4
Gage Reag. D
0:26
5
Gage Reag. E
0:26
6
Gauge Span Water
0:26
7
Gauge Samp. L1
0:26
8
Wastewater P-cell
0:10
9
Drain Reag. A
0:30
10
Drain Reag. B
0:30
11
Drain Reag. C
0:30
12
Drain Reag. D
0:30
13
Drain Reag. E
0:40
14
Drain Span Water
0:10
15
Drain Blank
0:20
16
Drain Sample L1
0:20
17
Wash cell
7:25
18
Pre-Wash
6:15
19
Preprocess
10:50
20
Discharge all
5:20
21
Pure water purge
Manual stop
22
Check Press
5:35
Содержание TPNA-500
Страница 1: ...Automatic Total Nitrogen Phosphorus Monitoring System TPNA 500 Instruction Manual CODE GZ0000371324D...
Страница 9: ...Type 1 2 4 3 5 2 type labels 6 For automatic hydrochloric acid cleaning specification...
Страница 12: ......
Страница 134: ...Function 118 MAINTENANCE STEP STEP ACTION SET Select various settings DECIDE START ACTION...
Страница 260: ......