
Section 2
Page 47
UVTOCUnpacking Installation Setup.fm
Drain and Vent Connections
The calibration connection is also
used for introducing the validation
standard and grab sample.
Install a short standpipe of 300 mm (12 in.) on the outlet leading to waste.
The outlet must be at ambient pressure.
The appropriate fittings, control valve, and tubing are user-supplied.
The connection ports on the fast-loop entry manifold are
1
/
8
-inch NPT.
The tube weight ensures that the fluid tube is at the bottom of the container.
Hand-tighten all fluid fittings. Do not overtighten.
2.8 Drain and Vent Connections
The analyzer produces waste gas and water. Refer to
for connection information.
A ¼-in. NPT (6 mm) port is provided to allow vent line extension for safe
venting to the atmosphere. Ensure that no vacuum or pressure is applied to
the vent line. Waste gas composition must be determined by the user and
dealt with appropriately based on type of gas and its occupational
threshold limits.
2.8.1 Dual Stream Option
Danger: Depending on the user’s
sample composition, waste
gases may be hazardous and
should be vented safely to the
atmosphere.
for Spanish, French,
German, or Italian translations.
Optional dual stream analyzers are shipped with the dual stream valve
detached from the analyzer. Use the components in the startup kit to attach
the valve after the analyzer has been securely placed in its permanent
mounting location.
Wastewater is removed from the analyzer through the liquid drain shown in
. The liquid waste drain pipe is extended out of the fluids (bottom)
cabinet via a 1½ inch drain pipe assembly. The wastewater is slightly acidic
and may be discharged to a common drain (at ambient pressure) without
special considerations. The drain installation must include the drain pipe
assembly to maintain the enclosure environmental ratings. Install the
extension at ambient pressure and at a downward slope.
Содержание 1950Plus
Страница 2: ...Page 2 4195M0040title page fm...
Страница 12: ...Page 12 Safety Precautions UVTOCSafety Precautions fm...
Страница 24: ...Page 24 EPA Mode UVTOCIntroduction fm...
Страница 26: ...Page 26 Installation UVTOCInstallation Stopper fm...
Страница 28: ...Page 28 Unpacking and Installation UVTOCUnpacking Installation Setup fm Section 2 Figure 6 Analyzer Dimensions...
Страница 54: ...Page 54 Storage and Handling Tips UVTOCReagents and Standards fm...
Страница 60: ...Page 60 Analyzer Adjustments UVTOCCommissioning fm...
Страница 62: ...Page 62 Operation UVTOCOperation Stopper fm...
Страница 110: ...Page 110 Maintenance UVTOCMaintenance Stopper fm...
Страница 128: ...Page 128 Replacing the Fuses UVTOCMaintenance fm...
Страница 137: ...Section 8 Page 137 UVTOCTroubleshooting and Service fm Service Menu Structure 8 5 Service Menu Structure...
Страница 146: ...Page 146 Fault ID Codes UVTOCTroubleshooting and Service fm...
Страница 152: ...Page 152 TC Conversion UVTOC_TC_conversion fm...
Страница 160: ...Page 160 Analyzer Pump Configurations UVTOC_PumpConfiguration fm...
Страница 164: ...Page 164 Glossary UVTOCGlossary fm...
Страница 172: ...Page 172 Replacement Parts UVTOCReplacement Parts fm...
Страница 176: ...Page 176 General Information UVTOCGeneral Information Stopper fm...
Страница 182: ...Page 182 4195M0040Certification fm Certification...