
Page 100
Calibration Menu
UVTOCOperation.fm
Section 6
4.
Press ENTER. This selects valves V1 and V2 and places the analyzer in
an offline status, drawing water from the zero inlet port. The display
changes, as shown in the following screen.
•
20 ppm is the current gas CO
2
ppm in the current calibration.
•
295s is the current seconds in the countdown (from the
pre zero period).
•
Last 17 ppm is the prior calibration zero water gas CO
2
ppm.
5.
After the pre zero period, the analyzer displays the CO
2
gas reading and
a message indicating whether or not the reading is stable. Press ENTER
to progress to the next screen.
The analyzer automatically detects the criteria for stability and displays
STAB, however, the user is responsible for determining that the zero is
sufficiently stable to proceed. A longer exposure to DI water creates a
better zero calibration. This is especially true when the analyzer has been
exposed to high concentrations of TOC immediately prior to gas
calibration.
6.
When the ppm CO
2
or mg/L TOC reading becomes stable, press ENTER
to lock the signal into the analyzer and display a fixed screen detailing the
live ppm CO
2
reading and prior zero ppm CO
2
reading.
7.
Press CTRL then ENTER to go back to the prior screen and allow
repeated update of the zero. A manual zero will automatically result in the
active calibration being a manual calibration.
6.10.4 Manual Span Calibration
Enter the Manual Span calibration menu by pressing UP from the Manual
zero menu.
1.
Press ENTER to select Manual Span and proceed to the calibration
standard value screen.
2 0 p p m
295s
L a s t
1 7 p p m
2 0 p p m
STAB
L a s t
1 7 p p m
L i v e
2 0 m g / l
Z e r o
2 0 m g / l
M a n u a l s p a n
M a n u a l s p a n
* 1 0 0 0 m g / l *
Содержание 1950Plus
Страница 2: ...Page 2 4195M0040title page fm...
Страница 12: ...Page 12 Safety Precautions UVTOCSafety Precautions fm...
Страница 24: ...Page 24 EPA Mode UVTOCIntroduction fm...
Страница 26: ...Page 26 Installation UVTOCInstallation Stopper fm...
Страница 28: ...Page 28 Unpacking and Installation UVTOCUnpacking Installation Setup fm Section 2 Figure 6 Analyzer Dimensions...
Страница 54: ...Page 54 Storage and Handling Tips UVTOCReagents and Standards fm...
Страница 60: ...Page 60 Analyzer Adjustments UVTOCCommissioning fm...
Страница 62: ...Page 62 Operation UVTOCOperation Stopper fm...
Страница 110: ...Page 110 Maintenance UVTOCMaintenance Stopper fm...
Страница 128: ...Page 128 Replacing the Fuses UVTOCMaintenance fm...
Страница 137: ...Section 8 Page 137 UVTOCTroubleshooting and Service fm Service Menu Structure 8 5 Service Menu Structure...
Страница 146: ...Page 146 Fault ID Codes UVTOCTroubleshooting and Service fm...
Страница 152: ...Page 152 TC Conversion UVTOC_TC_conversion fm...
Страница 160: ...Page 160 Analyzer Pump Configurations UVTOC_PumpConfiguration fm...
Страница 164: ...Page 164 Glossary UVTOCGlossary fm...
Страница 172: ...Page 172 Replacement Parts UVTOCReplacement Parts fm...
Страница 176: ...Page 176 General Information UVTOCGeneral Information Stopper fm...
Страница 182: ...Page 182 4195M0040Certification fm Certification...