
Section 1
Page 23
UVTOCIntroduction.fm
EPA Mode
1.10.1 Connection Information
Carrier gas and fluid connections are made at the compression fittings
located on the lower left-hand side of the analyzer. EPA mode requires the
optional dual-stream kit as shown in
.
Samples between 70–100 °C
(160-212 °F) can be accommodated
using an external cooler consisting
of a 3000 mm (120 in) long,
6 mm (1/4 in) O.D. stainless steel
sample inlet tube at a flow rate
of 25-60 mL/minute.
After connections are made, make certain that they are leak free.
If the analyzer is not equipped with a fast-loop sweep, the sample and/or
dilution entry port are connected to an ambient pressure source.
If the analyzer is equipped with a fast-loop sweep, the sample and dilution
(if fitted) entry port can be connected to a pressurized source of up to 6 bar
(87 psi), with a control valve (needle valve) placed on the inlet to throttle down
the flow to between 20 and 200 mL/min.
The calibration connection is also
used for introducing the validation
standard and grab sample.
Install a short standpipe of 300 mm (12 in) on the outlet leading to waste.
The outlet must be at ambient pressure.
The appropriate fittings, control valve, and tubing are user-supplied.
The connection ports on the fast-loop entry manifold are 1/8 inch NPT.
Figure 5 Inlet Configuration for the Analyzer
1.
Single Stream Inlet Manifold
2.
Dual Stream Inlet Manifold
Note: Make carrier gas and fluid connections as shown on lower left-hand side of the fluids cabinet.
STREAM
DILUTION
ACID
CARRIER
PE
RS
ULF
ATE
ZER
O
CLEAN
VA
LID
ATIO
N
CA
LIB
RAT
IO
N
GR
AB
S
AM
PLE
ST
RE
AM
2
DIL
UT
IO
N (R
EA
R P
OR
T)
ST
RE
AM
1
AC
ID
CA
RR
IE
R
PE
RS
ULF
ATE
ZE
RO
CLE
AN
VA
LID
ATION
CALIBRA
TION
GRAB SAMPLE
2
1
Содержание 1950Plus
Страница 2: ...Page 2 4195M0040title page fm...
Страница 12: ...Page 12 Safety Precautions UVTOCSafety Precautions fm...
Страница 24: ...Page 24 EPA Mode UVTOCIntroduction fm...
Страница 26: ...Page 26 Installation UVTOCInstallation Stopper fm...
Страница 28: ...Page 28 Unpacking and Installation UVTOCUnpacking Installation Setup fm Section 2 Figure 6 Analyzer Dimensions...
Страница 54: ...Page 54 Storage and Handling Tips UVTOCReagents and Standards fm...
Страница 60: ...Page 60 Analyzer Adjustments UVTOCCommissioning fm...
Страница 62: ...Page 62 Operation UVTOCOperation Stopper fm...
Страница 110: ...Page 110 Maintenance UVTOCMaintenance Stopper fm...
Страница 128: ...Page 128 Replacing the Fuses UVTOCMaintenance fm...
Страница 137: ...Section 8 Page 137 UVTOCTroubleshooting and Service fm Service Menu Structure 8 5 Service Menu Structure...
Страница 146: ...Page 146 Fault ID Codes UVTOCTroubleshooting and Service fm...
Страница 152: ...Page 152 TC Conversion UVTOC_TC_conversion fm...
Страница 160: ...Page 160 Analyzer Pump Configurations UVTOC_PumpConfiguration fm...
Страница 164: ...Page 164 Glossary UVTOCGlossary fm...
Страница 172: ...Page 172 Replacement Parts UVTOCReplacement Parts fm...
Страница 176: ...Page 176 General Information UVTOCGeneral Information Stopper fm...
Страница 182: ...Page 182 4195M0040Certification fm Certification...