
Section 1
Page 21
UVTOCIntroduction.fm
Installation
Oxidation
The sample is combined with carrier gas and sodium persulfate. These
additions promote oxidation in the UV reactor. The reactor converts the
carbon in the sample to CO
2
. The CO
2
is again removed from the sample at
the GLS and is routed to the IR detector.
Measurement
The IR detector measures the CO
2
. The CO
2
concentration is proportional to
the carbon concentration in the sample.
1.5 Installation
The analyzer is easily installed by users familiar with water analysis
instruments. Complete installation instructions are in
A discussion of safety precautions for handling electrical connections, carrier
gas, and chemical solutions is in
. Please read
before installing
the analyzer.
1.6 Start-up and Operation
The procedure for starting up and operating the system is in
. Analyzer operation is covered in
1.7 Calibration
, has procedures for calibrating the system in Auto or
Manual modes. Accurate calibration allows the instrument to respond over a
wide analysis range. A description of how to make calibration standards can
be found in
1.8 Miscellaneous
•
, presents methods for preparing reagents and
calibration standards.
•
A discussion of safety precautions for handling carrier gas and chemical
solutions is in
.
•
, contains information on how to interpret and
correct malfunctions.
•
, contains a list of abbreviations, acronyms and
definitions used in this manual.
•
, contains a listing of consumables, accessories,
spare parts, chemicals, electrical, electronic and mechanical
components, and major hardware items.
1.9 Technical Support and Assistance
For questions on the operation and maintenance of the analyzer, call 1-800-
227-4224 (in the U.S.A). International customers call (970) 669-2932.
Содержание 1950Plus
Страница 2: ...Page 2 4195M0040title page fm...
Страница 12: ...Page 12 Safety Precautions UVTOCSafety Precautions fm...
Страница 24: ...Page 24 EPA Mode UVTOCIntroduction fm...
Страница 26: ...Page 26 Installation UVTOCInstallation Stopper fm...
Страница 28: ...Page 28 Unpacking and Installation UVTOCUnpacking Installation Setup fm Section 2 Figure 6 Analyzer Dimensions...
Страница 54: ...Page 54 Storage and Handling Tips UVTOCReagents and Standards fm...
Страница 60: ...Page 60 Analyzer Adjustments UVTOCCommissioning fm...
Страница 62: ...Page 62 Operation UVTOCOperation Stopper fm...
Страница 110: ...Page 110 Maintenance UVTOCMaintenance Stopper fm...
Страница 128: ...Page 128 Replacing the Fuses UVTOCMaintenance fm...
Страница 137: ...Section 8 Page 137 UVTOCTroubleshooting and Service fm Service Menu Structure 8 5 Service Menu Structure...
Страница 146: ...Page 146 Fault ID Codes UVTOCTroubleshooting and Service fm...
Страница 152: ...Page 152 TC Conversion UVTOC_TC_conversion fm...
Страница 160: ...Page 160 Analyzer Pump Configurations UVTOC_PumpConfiguration fm...
Страница 164: ...Page 164 Glossary UVTOCGlossary fm...
Страница 172: ...Page 172 Replacement Parts UVTOCReplacement Parts fm...
Страница 176: ...Page 176 General Information UVTOCGeneral Information Stopper fm...
Страница 182: ...Page 182 4195M0040Certification fm Certification...