
Appendix A
Page 149
UVTOC_TC_conversion.fm
TC Conversion
TC Conversion—With Dilution
Refer to
and perform the following steps:
1.
Remove the acid pump tube.
2.
Remove the acid pump barbs and replace with ¼-28 blank plugs from
start-up kit.
3.
Remove the overflow tube from top of sparger and from GLS.
4.
Insert luer adapter and PTFE filter from the start-up kit into the top of the
sparger block.
Important Note:There are two different port depths on the analyzer. If the port on your
analyzer is 9.9 mm (0.39 in.) deep, remove the ferrule with the metal ring from the
discarded overflow tube 3. Insert this ferrule into the sparger port yellow side
down before screwing in the luer adapter (see
).
5.
Remove ¼-28 blank plug.
6.
Create a new overflow tube from the spare parts in the start-up kit.
a.
Using the PFA pipe with the larger 1.5 mm (0.06 in.) bore, cut a new
tube 950 mm (37.4 in.) long.
b. Add a ¼-28 nut and ferrule at the sparger end (see Detail A in
c.
Add the
1
/
8
” white compression fitting from the discarded overflow
tube at the GLS end.
d. Route the new tube through the rubber grommet in the bottom of the
pump chassis. The new tube should run from the GLS to where the
blank plug was removed.
e.
Carefully route the new overflow tube so that it does not hinder the
rotation of the pump motor fan blades.
7.
Remove the flow element (black slotted device).
8.
Remove the O-ring from the bottom of the flow element block.
9.
Replace O-ring with the rubber disc from the start-up kit.
10. Replace the flow element.
Содержание 1950Plus
Страница 2: ...Page 2 4195M0040title page fm...
Страница 12: ...Page 12 Safety Precautions UVTOCSafety Precautions fm...
Страница 24: ...Page 24 EPA Mode UVTOCIntroduction fm...
Страница 26: ...Page 26 Installation UVTOCInstallation Stopper fm...
Страница 28: ...Page 28 Unpacking and Installation UVTOCUnpacking Installation Setup fm Section 2 Figure 6 Analyzer Dimensions...
Страница 54: ...Page 54 Storage and Handling Tips UVTOCReagents and Standards fm...
Страница 60: ...Page 60 Analyzer Adjustments UVTOCCommissioning fm...
Страница 62: ...Page 62 Operation UVTOCOperation Stopper fm...
Страница 110: ...Page 110 Maintenance UVTOCMaintenance Stopper fm...
Страница 128: ...Page 128 Replacing the Fuses UVTOCMaintenance fm...
Страница 137: ...Section 8 Page 137 UVTOCTroubleshooting and Service fm Service Menu Structure 8 5 Service Menu Structure...
Страница 146: ...Page 146 Fault ID Codes UVTOCTroubleshooting and Service fm...
Страница 152: ...Page 152 TC Conversion UVTOC_TC_conversion fm...
Страница 160: ...Page 160 Analyzer Pump Configurations UVTOC_PumpConfiguration fm...
Страница 164: ...Page 164 Glossary UVTOCGlossary fm...
Страница 172: ...Page 172 Replacement Parts UVTOCReplacement Parts fm...
Страница 176: ...Page 176 General Information UVTOCGeneral Information Stopper fm...
Страница 182: ...Page 182 4195M0040Certification fm Certification...