Chapter 15: Maintaining Your Library
Maintenance Actions
Quantum Scalar i6000 User’s Guide
647
Running the Verification Tests
This section provides instructions for starting the installation verification
test, partial test, FRU operational test, and custom test.
To stop a test, disable the robotics by pressing the
Robotics Enable
button on the operator panel or by clicking
Stop
on the
Verification
Tests
dialog box. Control will be returned to you as soon as the current
command is completed.
The test results appear after the tests complete. The different reports
(
Library Report
,
Drive Report
, and
Blade Report
) will be generated
and viewable in the
Reports
area of the
Verification Tests
dialog box.
If a typical user logs on while an administrator is logged on and running
a verification test, testing will continue unaffected. Only one
administrator can be logged on at any given time.
Install Verification Test
When the Install verification test is running, no one else can log on to
the library. The message, “Verification Test is Running,” appears in the
Activity
area of the main LMC display.
1
Log on as an administrator.
2
Make sure that you are viewing the physical library. From the
View
menu, click the name of the physical library.
3
Click
Tools
>
Verification Tests
. The
Verification Tests
dialog box
appears.
Summary of Contents for Scalar i6000
Page 1: ...User s Guide Scalar i6000 6 66879 15 Rev B...
Page 276: ...Chapter 3 Configuring Your Library Working with Towers 258 Quantum Scalar i6000 User s Guide...
Page 344: ...Chapter 8 Encryption Key Management Using SKM 326 Quantum Scalar i6000 User s Guide...
Page 444: ...Chapter 11 Configuring Access to StorNext 426 Quantum Scalar i6000 User s Guide...
Page 450: ...Chapter 12 Partition Utilization Reporting 432 Quantum Scalar i6000 User s Guide...
Page 574: ...Chapter 15 Maintaining Your Library Maintenance Actions 556 Quantum Scalar i6000 User s Guide...
Page 730: ...Appendix A Frequently Asked Questions 684 Quantum Scalar i6000 User s Guide...