9-52
INTEGRA Operations Revision A
7/26/00
20-0200-231 (CR), 20-0200-232 (Std), 20-0200-251 (CD)
Use the following procedure with
each
of the nine separate EVENTS.
1 Touch MODIFY SPIN EVENTS
1-3
to access the variable settings for
the first three Spin Station EVENTS. This displays the
SPIN STATION
PROCESS PROGRAM DEFINE EVENTS 1-3
for EVENTS
1-3
.
Time
0-1800
(3 min max)
10
th
of seconds
Spindle Speed
(Never run above 2000 rpm with
wafer present.)
0, or 30-2500
rpm
Megasonic Sweeps
0-25
sweeps
Seconds/Sweep
0, or 5-15
seconds/sweep
STANDARD
TEST
TEST2
SHORT
Spin Station recipe
access buttons used
to set the 9 EVENTS
that control the total
Spin Station process
dry cycle.
STANDARD
Summary of Contents for Synergy Integra
Page 8: ......
Page 24: ...1 4 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...
Page 38: ...2 14 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...
Page 222: ...9 62 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...
Page 314: ...10 76 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...