OPERATION
8. Start engine and lower header onto ground until
member (A) lifts off link (B) on both sides.
9. Stop engine and remove key.
Figure 4.87: Lift Linkage
10. On high side, remove nut, washer, and bolt (A) that
attaches shims (B) to link.
11. Remove one or both shims (B) and reinstall the
hardware (A).
12. Start engine and raise header fully.
13. Stop engine and remove key from ignition.
14. Move
fl
oat pins to disengaged position.
15. Start engine and set header approximately 6 in. (150
mm) off ground and check that member (A) is against
link (B). Stop engine and remove key from ignition.
16. Measure distance to ground at both ends of header.
17. If additional levelling is required, repeat steps 6 to 9
and install the removed shim on the opposite linkage.
NOTE:
If required, additional shims are available from
your Dealer.
Figure 4.88: Lift Linkage
18. Once header is level, return
fl
oat pins to their engaged
position (A).
NOTE:
Float does
NOT
require adjustment after
levelling header.
Figure 4.89: Float Pins – Engaged
147649
201
Revision A
Summary of Contents for M155
Page 3: ...Declaration of Conformity Figure 1 Declaration of Conformity Page 1 of 2 147649 i Revision A ...
Page 4: ...Figure 2 Declaration of Conformity Page 2 of 2 147649 ii Revision A ...
Page 30: ...SAFETY Figure 1 21 Safety Signs Left Cab forward Side 147649 14 Revision A ...
Page 32: ...SAFETY Figure 1 23 Safety Signs Right Cab forward Side 147649 16 Revision A ...
Page 44: ......
Page 54: ......
Page 320: ......
Page 414: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 178 Fuse Decal 147649 398 Revision A ...
Page 468: ......
Page 509: ......