OPERATION
10. Remove cotter pin on clevis pin (B) and remove pin to
disconnect from header. Reinstall clevis pin in header.
11. Tighten nut against barrel (A). A slight tap with a
hammer is suf
fi
cient.
Figure 4.274: Mechanical Center-Link
12. Disconnect
header
drive
hydraulics
(A)
and
electrical harness (B). Refer to the R-Series Header
Operator’s Manual.
13. Start engine and slowly back windrower away
from header.
Figure 4.275: Header Drive Hydraulics
14. Stops engine and remove the key.
15. Reinstall the clevis pin (A) through each boot (C) and
secure with hairpin (B). Do this to both sides.
Figure 4.276: Header Boots
147649
278
Revision A
Summary of Contents for M155
Page 3: ...Declaration of Conformity Figure 1 Declaration of Conformity Page 1 of 2 147649 i Revision A ...
Page 4: ...Figure 2 Declaration of Conformity Page 2 of 2 147649 ii Revision A ...
Page 30: ...SAFETY Figure 1 21 Safety Signs Left Cab forward Side 147649 14 Revision A ...
Page 32: ...SAFETY Figure 1 23 Safety Signs Right Cab forward Side 147649 16 Revision A ...
Page 44: ......
Page 54: ......
Page 320: ......
Page 414: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 178 Fuse Decal 147649 398 Revision A ...
Page 468: ......
Page 509: ......