
OPERATION
7. Remove
fl
oat pin from engaged position (A) and insert
in storage location (B). Secure with lynch pin.
Figure 4.40: Lift Arms
8. Remove pins (A) from lower end of lift linkages.
NOTE:
Pins (A) are also used to secure weight box to
windrower linkage.
9. Release the safety props on the header lift cylinders.
Refer to
4.4.1 Header Safety Props, page 193
.
10. Start engine and lower header down onto the
transport wheels.
Figure 4.41: Lift Arms
11. Use the HEADER TILT switches to release load on the
center-link if necessary.
12. Shut down engine and remove key from ignition.
Figure 4.42: Ground Speed Lever (GSL)
A - Header Tilt Down
B - Header Tilt Up
147649
180
Revision A
Summary of Contents for M155
Page 3: ...Declaration of Conformity Figure 1 Declaration of Conformity Page 1 of 2 147649 i Revision A ...
Page 4: ...Figure 2 Declaration of Conformity Page 2 of 2 147649 ii Revision A ...
Page 30: ...SAFETY Figure 1 21 Safety Signs Left Cab forward Side 147649 14 Revision A ...
Page 32: ...SAFETY Figure 1 23 Safety Signs Right Cab forward Side 147649 16 Revision A ...
Page 44: ......
Page 54: ......
Page 320: ......
Page 414: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 178 Fuse Decal 147649 398 Revision A ...
Page 468: ......
Page 509: ......