OPERATION
14. Start engine and press HEADER DOWN switch (A) on
ground speed lever (GSL) to lower lift arms until the lift
arm lifts away from the linkage at the rear of the lift arm.
Figure 4.61: GSL
15. Attach slow speed transport hitch to the weight box
tongue with drawbar pin. Secure using lynch pin (A).
Attach safety chain (B).
16. Connect hitch harness (C) to electrical socket at front
of weight box.
Figure 4.62: Weight Box
17. Remove the temporary lift pins (A) (should be loose in
lift arm) and place into storage holes on weight box.
Figure 4.63: Lift Arms
Converting from Field to Transport Mode
DANGER
To avoid bodily injury or death from unexpected startup of the machine, always stop the engine and remove
the key from the ignition before leaving the operator’s seat for any reason.
147649
187
Revision A
Summary of Contents for M155
Page 3: ...Declaration of Conformity Figure 1 Declaration of Conformity Page 1 of 2 147649 i Revision A ...
Page 4: ...Figure 2 Declaration of Conformity Page 2 of 2 147649 ii Revision A ...
Page 30: ...SAFETY Figure 1 21 Safety Signs Left Cab forward Side 147649 14 Revision A ...
Page 32: ...SAFETY Figure 1 23 Safety Signs Right Cab forward Side 147649 16 Revision A ...
Page 44: ......
Page 54: ......
Page 320: ......
Page 414: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 178 Fuse Decal 147649 398 Revision A ...
Page 468: ......
Page 509: ......