
OPERATION
19. Connect header drive hoses (A) and electrical
harness (B) to header. Refer to the draper header
operator’s manual.
Figure 4.149: Header Drive Hoses and Harness
20. Connect reel hydraulics (A) at right cab-forward
side of windrower.
Refer to the draper header
operator’s manual.
Figure 4.150: Reel Hydraulics
4.5.2
Detaching a D-Series Header
Refer to the procedure that is appropriate for the center-link installed on the windrower:
•
Detaching a D-Series Header: Hydraulic Center-Link, page 230
•
Detaching a D-Series Header: Mechanical Center-Link, page 233
147649
229
Revision A
Summary of Contents for M155
Page 3: ...Declaration of Conformity Figure 1 Declaration of Conformity Page 1 of 2 147649 i Revision A ...
Page 4: ...Figure 2 Declaration of Conformity Page 2 of 2 147649 ii Revision A ...
Page 30: ...SAFETY Figure 1 21 Safety Signs Left Cab forward Side 147649 14 Revision A ...
Page 32: ...SAFETY Figure 1 23 Safety Signs Right Cab forward Side 147649 16 Revision A ...
Page 44: ......
Page 54: ......
Page 320: ......
Page 414: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 178 Fuse Decal 147649 398 Revision A ...
Page 468: ......
Page 509: ......