OPERATION
5. Use the following GSL functions to position the
center-link hook above the header attachment pin:
• Header tilt up (A) to retract the center-link
• Header tilt down (B) to extend the center-link
6. Stop engine and remove key from ignition.
Figure 4.238: GSL
7. Push down on rod end of link cylinder (B) until hook
engages and locks onto header pin.
IMPORTANT:
Hook release must be down to enable self-locking
mechanism. If the release is open (up), manually
push it down after hook engages header pin.
8. Check that center-link (A) is locked onto header by
pulling upward on rod end (B) of cylinder.
Figure 4.239: Hydraulic Center-Link
CAUTION
Check to be sure all bystanders have cleared the area.
9. Start the engine.
10. Press the header up switch (A) to raise header to
maximum height.
NOTE:
If one end of the header does
NOT
fully raise,
rephase the lift cylinders as follows:
a. Press and hold the header up switch until both
cylinders stop moving.
b. Continue to hold the switch for 3–4 seconds.
Cylinders are now phased.
NOTE:
It may be necessary to repeat this procedure if
there is air in the system.
Figure 4.240: GSL
147649
264
Revision A
Summary of Contents for M155
Page 3: ...Declaration of Conformity Figure 1 Declaration of Conformity Page 1 of 2 147649 i Revision A ...
Page 4: ...Figure 2 Declaration of Conformity Page 2 of 2 147649 ii Revision A ...
Page 30: ...SAFETY Figure 1 21 Safety Signs Left Cab forward Side 147649 14 Revision A ...
Page 32: ...SAFETY Figure 1 23 Safety Signs Right Cab forward Side 147649 16 Revision A ...
Page 44: ......
Page 54: ......
Page 320: ......
Page 414: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 178 Fuse Decal 147649 398 Revision A ...
Page 468: ......
Page 509: ......