
OPERATION
2. Park windrower on level ground.
3. Raise header fully and hold momentarily to allow lift
cylinders to rephase.
Figure 4.84: Ground Speed Lever (GSL)
4. Set header approximately 6 in. (150 mm) off ground
and check that member (A) is against link (B). Stop
engine and remove key from ignition.
5. Measure distance to ground at both ends of header and
determine the end that is higher.
6. If adjustment is necessary, start engine and raise
header fully. Turn off engine and remove key from
ignition.
Figure 4.85: Lift Linkage
7. Move
fl
oat pins to engaged position (A).
Figure 4.86: Float Pins – Engaged
147649
200
Revision A
Summary of Contents for M155
Page 3: ...Declaration of Conformity Figure 1 Declaration of Conformity Page 1 of 2 147649 i Revision A ...
Page 4: ...Figure 2 Declaration of Conformity Page 2 of 2 147649 ii Revision A ...
Page 30: ...SAFETY Figure 1 21 Safety Signs Left Cab forward Side 147649 14 Revision A ...
Page 32: ...SAFETY Figure 1 23 Safety Signs Right Cab forward Side 147649 16 Revision A ...
Page 44: ......
Page 54: ......
Page 320: ......
Page 414: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 178 Fuse Decal 147649 398 Revision A ...
Page 468: ......
Page 509: ......