
OPERATION
13. Install pin (B) through the header leg (engaging
U-bracket in lift linkage) on both sides and secure with
hairpin (A).
14. Raise header stand (D) to storage position by pulling
spring pin (C) and lifting stand into uppermost position.
Release spring pin.
Figure 4.133: Header Leg
15. Remove clevis pin from storage position (B) in linkage
and insert into hole (A) to engage
fl
oat springs. Secure
with hairpin.
Figure 4.134: Header Float Linkage
16. Disengage safety prop by turning lever (A) downwards
to release and lower stop until lever locks into
vertical position.
17. Repeat for opposite safety prop.
Figure 4.135: Safety Prop
147649
223
Revision A
Summary of Contents for M155
Page 3: ...Declaration of Conformity Figure 1 Declaration of Conformity Page 1 of 2 147649 i Revision A ...
Page 4: ...Figure 2 Declaration of Conformity Page 2 of 2 147649 ii Revision A ...
Page 30: ...SAFETY Figure 1 21 Safety Signs Left Cab forward Side 147649 14 Revision A ...
Page 32: ...SAFETY Figure 1 23 Safety Signs Right Cab forward Side 147649 16 Revision A ...
Page 44: ......
Page 54: ......
Page 320: ......
Page 414: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 178 Fuse Decal 147649 398 Revision A ...
Page 468: ......
Page 509: ......