
OPERATION
2. Position boot (B) onto lift linkage (A) and reinstall
pin (C). Pin may be installed from either side of boot.
3. Secure pin (C) with hairpin (D).
4. Repeat for opposite side.
Figure 4.282: Header Boot
4.6.3
Header Position
Refer to
4.4 Operating with a Header, page 193
for procedures for controlling header height, header tilt, and
fl
oat.
4.6.4
Adjusting the Reel Fore-Aft Position
The reel fore-aft position can be hydraulically adjusted
with the optional reel position system and is controlled with
multi-function switches on the ground speed lever (GSL).
Press and hold the switch for the desired FORWARD (A)
or AFT (B) movement of the reel.
NOTE:
The switches also control adjustments to the optional
double windrow attachment (DWA) conveyor and
can be activated when programming the cab display
module (CDM).
Figure 4.283: Ground Speed Lever (GSL)
147649
281
Revision A
Summary of Contents for M155
Page 3: ...Declaration of Conformity Figure 1 Declaration of Conformity Page 1 of 2 147649 i Revision A ...
Page 4: ...Figure 2 Declaration of Conformity Page 2 of 2 147649 ii Revision A ...
Page 30: ...SAFETY Figure 1 21 Safety Signs Left Cab forward Side 147649 14 Revision A ...
Page 32: ...SAFETY Figure 1 23 Safety Signs Right Cab forward Side 147649 16 Revision A ...
Page 44: ......
Page 54: ......
Page 320: ......
Page 414: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 178 Fuse Decal 147649 398 Revision A ...
Page 468: ......
Page 509: ......