
OPERATION
CAUTION
Check to be sure all bystanders have cleared the area.
15. Start the engine and activate the header down
switch (A) on the GSL to fully lower the header.
16. Stop engine and remove key from ignition.
Figure 4.257: GSL
17. Connect header drive hoses (A) and electrical
harness (B) to header. Refer to the rotary disc header
operator’s manual.
Figure 4.258: Header Drive Hoses and Harness
4.5.6
Detaching an R-Series Header
Refer to the procedure that is appropriate for the center-link installed on the windrower:
•
Detaching an R-Series Header: Hydraulic Center-Link, page 272
•
Detaching an R-Series Header: Mechanical Center-Link, page 275
147649
271
Revision A
Summary of Contents for M155
Page 3: ...Declaration of Conformity Figure 1 Declaration of Conformity Page 1 of 2 147649 i Revision A ...
Page 4: ...Figure 2 Declaration of Conformity Page 2 of 2 147649 ii Revision A ...
Page 30: ...SAFETY Figure 1 21 Safety Signs Left Cab forward Side 147649 14 Revision A ...
Page 32: ...SAFETY Figure 1 23 Safety Signs Right Cab forward Side 147649 16 Revision A ...
Page 44: ......
Page 54: ......
Page 320: ......
Page 414: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 178 Fuse Decal 147649 398 Revision A ...
Page 468: ......
Page 509: ......