Procedure 5-35: Clear
″
inc. VT
″
conditions/alarms
....................................................................................................................................................................................................................................
Overview
This procedure is used to clear all
inc. VT
conditions/alarms,
including:
•
inc. VT AIS
•
inc. VT LOP
•
inc. VT RFI-V
•
inc. VT sig. degrade (BER)
•
inc. VT unequipped
Refer
and
Chapter 3, “Alarms, conditions, and
for the possible alarm levels for the different alarms.
Before you begin
Prior to performing this procedure:
1.
Refer to
and
in this chapter.
2.
Refer to
and
“Electrostatic discharge” (1-13)
in
Procedure
Complete the following steps to clear an
inc. VT
alarm.
............................................................................................................................................................
1
From the WaveStar
®
CIT System View, click the
Alarm List
button
and locate the
inc. VT
alarm in the resulting alarm list.
............................................................................................................................................................
2
Determine the alarm level(s) for the active
inc. VT
alarm(s) (for
example, MJ or MN). Clear the alarms in order of severity, MJ (SA),
MN (NSA), and then Not Alarmed.
............................................................................................................................................................
3
Refer to the Probable Cause column in the alarm list, determine the
circuit pack affected by the
inc. VT
alarm, and note the
corresponding AID.
............................................................................................................................................................
4
Note the source address of the VT alarm/condition reported (for
example, main-1-1-1-1). Based on the circuit layout or other office
records, determine the far-end network element where that time slot is
supposed to be terminated (cross-connected to a DS1 termination).
Trouble clearing procedures
....................................................................................................................................................................................................................................
5 - 1 0 8
Lucent Technologies
365-372-333 R2.1
Issue 4, June 2005