Official GSK Agents in South Africa
Tel: +27 11 626 2720, [email protected]
GSK218MC Series Machining Center CNC System PLC & Installation Connection Manual
VIII
is important to cut off the product’s power.
■
Inspection and maintenance
z
Cut off the power before inspecting and maintaining or changing the
components.
z
Check the malfunction when the short-circuit or overloading occurs. The
computer can be started after the malfunction is eliminated.
z
Do not power ON/OFF frequently for the product, if you want to turn on the
power again after power off, its interval time is 1min. at least.