Official GSK Agents in South Africa
Tel: +27 11 626 2720, [email protected]
GSK218MC Series Machining Center CNC System PLC & Installation Connection Manual
76
Volume II
Operatio
n
data column on screen, upward or downward search by pressing the
or
after inputting.
z
Save: The modified ladder diagram is saved by pressing the
key.
Illustrations of the ladder diagram programming:
1. The cursor is positioned as the start place of the programming position, a normally opened
contact symbol occurs at the cursor’s positioning by
[ ]
soft key, directly input the
component name X1.4, affirm it by pressing the
key, the component X001.4
appears on the current cursor position.
2. Rightward one place of the cursor, press the
[ ]
soft key, a symbol of the normally closed
contact occurs at the cursor positioning, directly input component name X2.1, affirm it by
pressing the
key, and then the X002.1 appears at the current cursor position.
3. The cursor is positioned at the next start position, press the
[ ]
soft key, a symbol of the
normally opened contact occurs at the cursor positioning, direct input the component name
X2.4, affirm it by pressing the
, the component then appears at the current cursor
position
4. Rightward one place of the cursor, press the
[——]
soft key, draw a horizontal breakover line
at the current cursor position;
5. Upward one place of the cursor, press the
[ ]
soft key, draw a vertical breakover line at
the lower right corner of the cursor.
6. Press the
[—( )]
soft key, the output coil is automatically generated (the required horizontal
breakover line), and then the output coil is produced at the right side of the ladder diagram.
Directly input the component name G1.0, affirm it by pressing thef
, the component
G001.0 occurs at the current cursor position.
The compiled ladder diagram is shown in the
Fig. 2-3-1
: