GSK218MC Series Machining Center CNC System PLC&Installation Connetion Manual
160
V
o
lume IV
Inst
allation &
Connecti
on
and the ESP signal should be connected with CNC system directly rather than come through the
strong current cabinet. The power supply must be connected with the earth properly.
Various sockets should be connected and the screw should be fixed tightly, and the joints of
cables are not allowed to plug and pull after power on.
Do not scratch the system control panel by the hard or sharp material when installing the CNC
control; take down the CNC system if painted to avoid dirtying the system panel.
Do not put the strong electricity or strong magnetism interference source around CNC system;
far away from the inflammable, the explosives and various hazard objects.